RESIDENTIAL · COMMERCIAL · INDUSTRIAL
The development
models
BUILT FASTER. BUILT BETTER. BUILT TO LAST.
PPVC · PRECAST MANUFACTURING · SOUTH AFRICA
Welcome to
VOLUMETRIC BUILDING SYSTEMS
PRECAST AFRICA
Transforming construction
across Africa
Precast Africa is a South African precast manufacturing and industrialised-
construction company. We cast complete reinforced-concrete room modules —
prefabricated prefinished volumetric construction (PPVC) — under factory
control, install and test their first-fix services indoors, then deliver and crane
them into place through one accountable team.
PRECAST MANUFACTURING FOR THE CONTINENT THAT NEEDS IT MOST.
PRECASTAFRICA.COM
Complete spaces,
cast whole.
OVERVIEW
A whole community,
from one factory.
Precast Africa plans, manufactures and delivers every
precinct of an integrated development. Every building
comes off the same volumetric precast line, and the water,
energy and landscape that serve them are planned into the
same masterplan, under one programme and one
accountable team.
THE RANGE
One building system.
Endless development possibilities.
A housing scheme is one home, repeated. Precast Africa moves
that repeatable part into a factory. Each room is cast as one
reinforced-concrete volume, four walls and a roof with no joint
between them. Plumbing and electrical first fix are installed and
tested before the module leaves. One accountable team delivers
it, cranes it onto the foundation and connects it.
PRECASTAFRICA.COM
RESIDENTIAL
01 Low- & medium-rise estates
02 Multi-storey walk-up apartments
03 Student accommodation
04 FLISP, social & affordable housing
05 Luxury residential
View Models
COMMERCIAL
06 Office blocks
07 Hospitals and clinics
08 Schools
09 Shopping centres
10 Guardhouses
11 Mixed-use developments
View Models
05
PRECASTAFRICA.COM
INDUSTRIAL
12 Warehousing and distribution
Manufacturing and light industrial
Workforce accommodation
Site offices and accommodation
Change houses and ablutions
Plant rooms and substations
13
14
15
16
17
View Models
On-site water & wastewater treatment
Solar energy & on-site storage
Alternative building methods
On-site waste management & recycling
Urban agriculture
A
B
C
D
E
SUSTAINABLE INTEGRATIONS
View Models
7
PPVC · PRECAST MANUFACTURING · SOUTH AFRICA
01
RESIDENTIAL MODELS
DEVELOPMENT MODELS 2026 | RESIDENTIAL
Five ways to build homes with one volumetric precast system —
from subsidy-linked housing to architect-led homes. Each
model is a different arrangement of the same factory-made
module, configured for its market.
5
MODELS
1+
BEDROOMS
19–95
SIZE RANGE
m²
1
MODULE FAMILY
RESIDENTIAL COMMERCIAL INDUSTRIAL
THE RANGE
RESIDENTIAL MODELS · 5 TYPES
Five models, one module family.
Five residential models on one module family, each
summarised overleaf with its zone, key figures and what it
gets right. Full module bills are in the Residential Models
brochure.
01
02
04
03
Low- & medium-rise
estates
Student accommodation
FLISP, social & affordable
housing
Walk-up apartments
±55–95 M² HOMES
±35–70 M² HOMES
19M²EN-SUITE ROOMS
±38–75 M² HOMES
Phased estate
developers.
FLISP, public-sector and subsidy-
linked programmes.
Density schemes for rental
and sale.
Universities and
residence operators.
VIEW
VIEW
VIEW
VIEW
05
PRECASTAFRICA.COM
RESIDENTIAL MODEL · 01 · 02 · 03
05
Luxury residential
95 M² HOMES
Private clients and their
architects.
VIEW
05
ARTIST'S IMPRESSION
ARTIST'S IMPRESSION
01
02
Estate homes
Walk-up apartments
ZONE 03 · TOWNHOUSES
ZONE 04 · APARTMENT PRECINCT
Phase one, repeated exactly.
Four homes to a landing.
Two- and three-bedroom homes cast, serviced and inspected in the
factory, so an estate releases phase by phase on one module family and
later phases inherit the tolerance the first one proved.
One, two and three-bedroom homes stacked four to a landing around one
stair core. Layouts are fixed at design freeze, so the block that arrives on
site is the block that was priced.
3–5
1
55–95m²
3+
2–4
35–70m²
MODULES PER HOME
STOREY
PER HOME
STOREYS
MODULES PER HOME
PER HOME
WHAT IT GETS RIGHT
WHAT IT GETS RIGHT
Later phases inherit the first · Release at the pace of sales · A
consistent site programme · One street, one standard
One core, one grid · Mix changes without re-engineering · A
balcony for every home · Priced at design freeze
05
PRECASTAFRICA.COM
RESIDENTIAL MODEL · 01 · 02 · 03
03
04
Student residences
Social & affordable
ZONE 04 · APARTMENT PRECINCT
ZONE 02 · FULL-TITLE HOMES
Beds before registration.
Housing, on the record.
En-suite rooms cast, serviced and inspected in the factory, so a
residence is one production run, handed over before students arrive
rather than during their first term.
One, two and three-bedroom homes procured as one production run,
with cost settled at design freeze and a production and installation
record for every module the programme pays for.
2–4
1
3–4
19m²
1
38–75m²
MODULES PER HOME
MODULE PER ROOM
STOREYS
EN-SUITE ROOM
STOREY
PER HOME
WHAT IT GETS RIGHT
WHAT IT GETS RIGHT
Handed over before registration · Bathrooms off the site · Built for
annual turnover · Solid walls between rooms
Cost settled before production · A record for every module ·
Volume without drift · Dignity that lasts
05
PRECASTAFRICA.COM
RESIDENTIAL MODEL · 01 · 02 · 03
05
Luxury residential
ZONE 02 · FULL-TITLE HOMES
Architecture, cast to tolerance.
Architect-led homes cast whole in steel moulds, with openings cast
rather than cut, on a programme that runs factory and site side by side.
Plan, cladding and glazing are set per site.
5
2
95m²
MODULES PER HOME
STOREYS
PER HOME
WHAT IT GETS RIGHT
Factory tolerance · Openings cast, not cut · A compressed
programme · The specification survives
PRECASTAFRICA.COM
PPVC · PRECAST MANUFACTURING · SOUTH AFRICA
02
COMMERCIAL MODELS
DEVELOPMENT MODELS 2026 | COMMERCIAL
Six ways to build for work, care, learning and trade with one
volumetric precast system — from a single guardhouse to a
clinic. Each model is a repeatable room, configured for its use.
6
MODELS
1–6
STOREYS
19–245
SPACE RANGE
m²
1
MODULE FAMILY
05
RESIDENTIAL COMMERCIAL INDUSTRIAL
THE RANGE
COMMERCIAL MODELS · 6 TYPES
Six models, one module family.
Six commercial models on one module family: offices, clinics,
schools, shopping centres, guardhouses and mixed-use
buildings, each summarised on the pages that follow.
02
01
03
04
Hospitals and clinics
Office blocks
Schools
Shopping centres
2–6 STOREY OFFICES
20 M² CONSULTING ROOMS
59M²CLASSROOMS
26–103 M² LINE SHOPS
Landlords and owner-
occupiers.
Neighbourhood and convenience
centre developers.
Health departments and
private operators.
Education
departments and
independent schools.
VIEW
VIEW
VIEW
VIEW
05
RESIDENTIAL COMMERCIAL INDUSTRIAL
05–06
Guardhouses & mixed-use
19–40 M² GUARDHOUSES
Estate and campus developers.
VIEW
05
ARTIST'S IMPRESSION
ARTIST'S IMPRESSION
COMMERCIAL · 01
COMMERCIAL · 02
Office blocks
Hospitals and clinics
ZONE 05 · MIXED-USE CENTRE
ZONE 06 · CIVIC & RECREATION
Floorplates, finished before fit-out.
Clinical rooms, finished off site.
Office buildings assembled from one module family on a grid that repeats floor to floor — services, ceilings
and finishes completed in the factory, so a tenant's fit-out starts against a finished shell.
Wards, consulting rooms and wet cores finished, tested and recorded in the factory, then installed as
complete rooms — keeping the wet trades, and their variability, off a site where care has to carry on.
2–6
103m²
245m²
1–3
20m²
59m²
STOREYS
OPEN-PLAN BAY
TYPICAL FLOORPLATE
STOREYS
CONSULTING ROOM
WARD
MODULE BILL
MODULE BILL
8 wide + 2 standard modules per floorplate
4 standard + 1 wet-core per consulting suite
WHAT IT GETS RIGHT
WHAT IT GETS RIGHT
A shell date you can let against · Fit-out against a finished floor · The floorplate repeats · Cool, quiet floors
Wet trades off a live site · Services routed once · A record for every room · Surfaces that clean down
05
PRECASTAFRICA.COM
ARTIST'S IMPRESSION
ARTIST'S IMPRESSION
COMMERCIAL · 03
COMMERCIAL · 04
Schools
Shopping centres
ZONE 06 · CIVIC & RECREATION
ZONE 05 · MIXED-USE CENTRE
Classrooms, delivered to term dates.
Line shops, handed over on the date.
Classroom blocks, ablutions and administration buildings cast, fitted and inspected in the factory — so a
campus is procured as one production run and handed over in the holiday it was promised for.
Neighbourhood and convenience centres with line shops cast on a repeating bay — so the shell handover date
is fixed at design freeze, and every tenant's fit-out programme can be priced against it.
1–3
59m²
3
1–2
51m²
26–103m²
STOREYS
STANDARD CLASSROOM
BLOCK TYPES
STOREYS
LINE SHOP
SHOP RANGE
MODULE BILL
MODULE BILL
3 standard modules per classroom
2 wide modules per line shop
WHAT IT GETS RIGHT
WHAT IT GETS RIGHT
Delivered in the holiday · Wet trades off the site · Built for hard use · Cool, quiet rooms
Shell dates set at design freeze · Tenant fit-out on its own programme · Anchors stay flexible · Units combine
and split
05
PRECASTAFRICA.COM
ARTIST'S IMPRESSION
ARTIST'S IMPRESSION
COMMERCIAL · 05
COMMERCIAL · 06
Guardhouses
Mixed-use developments
ZONE 01 · SECURITY GATE PRECINCT
ZONE 05 · MIXED-USE CENTRE
One lift, one finished guardhouse.
Homes above, the street below.
The smallest complete building the system makes. Glazing, ablution, power and data are installed and tested
indoors; the module arrives finished, is craned into position in a single visit and commissioned the same day.
Standardised residential modules stacked over a conventional podium. The apartments are cast, fitted and
inspected in the factory while the podium is built on site — and the ground floor stays free for retail, office or
community use.
1–2
19–40m²
1
3
55m²
3
MODULES
PER FACILITY
CRANE VISIT
RESIDENTIAL STOREYS
TWO-BEDROOM HOME
MODULES PER HOME
MODULE BILL
1 standard + 1 half module
MODULE BILL
2 standard + 1 wet-core per home, plus stair core
WHAT IT GETS RIGHT
Installed in one visit · Commissioned the same day · A post people can stay at · Solid where it matters
WHAT IT GETS RIGHT
A clear line between systems · Built in parallel · Separation from the street · Services that transfer cleanly
05
PRECASTAFRICA.COM
PPVC · PRECAST MANUFACTURING · SOUTH AFRICA
03
Industrial MODELS
DEVELOPMENT MODELS 2026 | INDUSTRIAL
Six ways to put permanent concrete rooms where industry
works — offices, crib rooms, change houses and plant rooms
built beside the operation, not in its way.
6
MODELS
1–3
STOREYS
10–77
ROOM RANGE
m²
1
MODULE FAMILY
RESIDENTIAL COMMERCIAL INDUSTRIAL
RESIDENTIAL COMMERCIAL INDUSTRIAL
Permanent rooms
where industry works
PRECASTAFRICA.COM
THE RANGE
INDUSTRIAL MODELS · 6 TYPES
Six models, one module family.
Six industrial models on one module family: support rooms
for warehouses and plants, workforce and site
accommodation, change houses and plant rooms.
·
02
01
03–04
05–06
Manufacturing & light industrial
Warehousing
Workforce housing
Change houses & plant rooms
39 M² OFFICE BAYS
51 M² QC ROOMS
20M²SLEEPING ROOMS
10–77 M² ROOMS
Logistics developers and
owner-operators.
Mines, utilities and process plants.
Plants working to
shutdown windows.
Mines, contractors
and remote
operations.
VIEW
VIEW
VIEW
VIEW
05
PRECASTAFRICA.COM
RESIDENTIAL MODEL · 01 · 02 · 03
05
Luxury residential
95 M² HOMES
Private clients and their
architects.
VIEW
05
ARTIST'S IMPRESSION
ARTIST'S IMPRESSION
INDUSTRIAL · 01
INDUSTRIAL · 02
Warehousing and distribution
Manufacturing and light industrial
ZONE 08 · URBAN AGRICULTURE
ZONE 09 · ON-SITE WATER TREATMENT
The shell stays steel. The rooms arrive finished.
Installed in the shutdown, occupied the same week.
Offices, ablutions, control rooms and gatehouses cast, fitted and inspected in the factory while the portal
frame goes up — then set against the shell as complete rooms, so the slowest trades never sit on the critical
path.
Quality-control rooms, supervisor offices, tool stores and crib rooms cast, fitted and inspected in the factory
— then placed inside or alongside a working plant in a planned shutdown window.
1–2
39m²
4
1–2
26m²
51m²
STOREYS
OFFICE BAY
ROOM TYPES
STOREYS
SUPERVISOR OFFICE
QC ROOM
MODULE BILL
MODULE BILL
4 standard + 1 wide + 1 wet-core per office-wing level
2 standard + 2 wide per two-storey support block
WHAT IT GETS RIGHT
WHAT IT GETS RIGHT
Built beside the frame, not after it · The shell stays a shell · Wet trades in the factory · Rooms that can be added
Placed in a planned window · No trades on a live floor · Quiet rooms in loud buildings · Moved when the line
moves
05
PRECASTAFRICA.COM
ARTIST'S IMPRESSION
ARTIST'S IMPRESSION
INDUSTRIAL · 03
INDUSTRIAL · 04
Workforce accommodation
Site offices and accommodation
ZONE 04 · APARTMENT PRECINCT
ZONE 01 · SECURITY GATE PRECINCT
A village, not a camp.
Permanent rooms, for temporary sites.
Sleeping rooms, ablutions, kitchens and recreation buildings cast, fitted and inspected in the factory from
one module family — permanent concrete accommodation still in good condition when the operation is in its
second decade.
Site offices, ablution blocks and crew accommodation cast in concrete rather than assembled from
containers — quieter, cooler and rated for repeated lifts. When a project closes out, the modules move to the
next one.
1–3
20m²
4
1–2
19–60m²
1–4
STOREYS
SLEEPING ROOM
BUILDING TYPES
STOREYS
PER FACILITY
MODULES PER FACILITY
MODULE BILL
MODULE BILL
10 standard + 2 wet-core per residence-block level
2 standard + 1 wet-core per site office
WHAT IT GETS RIGHT
WHAT IT GETS RIGHT
Condition that lasts · Built for remote sites · Rest between shifts · Grows with the workforce
Rated for repeated lifts · Cooler than a container · Quieter on a loud site · An asset, not a write-off
05
PRECASTAFRICA.COM
ARTIST'S IMPRESSION
ARTIST'S IMPRESSION
INDUSTRIAL · 05
INDUSTRIAL · 06
Change houses and ablutions
Plant rooms and substations
ZONE 06 · CIVIC & RECREATION
ZONE 10 · SOLAR ENERGY
Wet works, tested before they travel.
A sealed room, cast to the drawings.
Showers, lockers, drainage and ventilation built and pressure-tested under factory control, then installed as
complete rooms at shaft or plant entry — ready for the full shift at every change.
Substations, pump houses, generator enclosures and process plant rooms as monolithic concrete boxes —
fire-resistant, secure and acoustically dense by material, with plinths, cable entries and ventilation cast in.
1
45m²
2
1
10–77m²
3
STOREY
CHANGE BAY
MODULE SIZES
STOREY
PER ENCLOSURE
MODULE SIZES
MODULE BILL
MODULE BILL
4 wet-core + 4 wide per four-bay change house
3 wide modules per switchgear room
WHAT IT GETS RIGHT
WHAT IT GETS RIGHT
Tested under factory control · Throughput at the change · Wet rooms that stay dry · Built for daily hard use
Dimensionally exact · Fire-resistant by material · Secure and sealed · Quiet by mass
05
PRECASTAFRICA.COM
Less waste.
Less carbon.
More homes.
Sustainability is embedded across the Precast Africa system — in material
choices, production control, product durability and business governance — not
bolted on afterwards.
SUSTAINABILITY
WATER
ENERGY
WASTE
AGRICULTURE
Rainwater harvesting,
greywater recovery and
nature-based filtration.
Rooftop photovoltaics with
storage and shared
distribution.
Separation at source, with
organic fractions
composted on site.
Greenhouses, raised beds
and orchards inside the
development.
LIVING
ALTERNATIVE BUILDING METHODS
& SUSTAINABLE DESIGN
SUSTAINABILITY INTEGRATION
24
INTEGRATED DEVELOPMENT
Precast Africa plans, manufactures and delivers every precinct of an
integrated development — full-title homes, townhouses, apartments, the
mixed-use centre and the civic buildings between them — with water, energy
and landscape planned into the same masterplan, under one programme and
one accountable team.
A settlement that
services itself.
Read More
40%
1
A1–A3
Less
MANPOWER AND TIME SAVINGS,
UP TO · SINGAPORE PPVC
BENCHMARK, NOT OUR RESULT
POUR PER MODULE · FOUR
WALLS AND ROOF CAST AS
ONE VOLUME
EMBODIED CARBON TO BE
MEASURED AND RECORDED
FOR EVERY MODULE
REDUCED NOISE, DUST,
TRAFFIC AND DISRUPTION ON
SITE
SUSTAINABILITY INTEGRATION
05
START A PROJECT
CONTACT
Have a project
in mind?
Bring us a room schedule and a programme. We will tell you
plainly whether industrialised delivery improves it, and
what it would take to prove that on your scheme.
Start Project
05
PRECASTAFRICA.COM
BUILT FASTER. BUILT BETTER. BUILT TO LAST.
PPVC · PRECAST MANUFACTURING · SOUTH AFRICA
www.precastafrica.com